Monday, 7 November 2011
SWOT Analysis
Posted by Spine Chiller Productions at 03:39 0 comments
Labels: Created by Sahir Ahmed
Sunday, 6 November 2011
Group Members- and their roles
AGE: 16
ROLE: To delegate duties and roles, and manage the team. In charge of costumes, documents needed to be signed and verified, props, sound and score notes, and other information needed to be gathered in order to gain insight into the production and the purpose of it.
CAMERAMAN: Sahir Ahmed
AGE: 18
ROLE: To correctly capture and manage all media filmed, making sure camera angles are precise, lighting and location are suitable to be filmed in, and to manage the blog and all other accounts associated with SpineChiller Productions. To also refer and consolidate with the director and editor of scenes and shots captured, so that the production can be formed to the needs of the director and editor.
EDITOR: Ahmed Khan
AGE: 16
ROLE: to successfully edit and reinvent the shots filmed, to meet the expectations of the director and cameraman, to edit effectively and correctly, to a high standard; so that it is believable and sustains continuity throughout. To also refer with the director and cameraman, and decide which score notes will be utilized within the production.
Posted by Spine Chiller Productions at 11:55 0 comments
Labels: Created by Jaspreet
Friday, 4 November 2011
Oaks Park Production Logo
Posted by Spine Chiller Productions at 03:19 0 comments
Labels: Posted by Sahir
Thursday, 3 November 2011
Final Draft- Three Wheels of Horror
Posted by Spine Chiller Productions at 15:22 0 comments
Labels: Created by Ahmed Khan, Created by Jaspreet, Created by Sahir Ahmed
Wednesday, 2 November 2011
Still images- Three Wheels of Horror
Posted by Spine Chiller Productions at 13:06 0 comments
Labels: Created by Jaspreet
Health and Safety
Posted by Spine Chiller Productions at 06:11 0 comments
Labels: Created by Sahir Ahmed
Weekly Updates- Week of 31st October (week 7)
Due to the week off, as a group we spent our half-term finishing off all paperwork and documents. This week is going to be the official week of filming, and as I had already prepared for this in week 5, we knew as a group we were well prepared and ready to go. Tomorrow would be the 1st, the day we are going to film. Today we stored the equipment and props in the classroom cupboard, to make sure it is safe for tomorrow's use.
| Sahir filming, I'm directing him, and our actor is watching the footage with us |
| Sahir filming |
| Behind the scenes with the director, cameraman and actor! |
| Here is Sahir filming, our actor Ahmed getting into role, and Mr Assegai asking the cameraman where he needs to be sat for the shot, to make sure it fits correctly into the frame |
Here are a few shots of our actor on set:
![]() |
| Jordan on set right after hair and makeup |
![]() |
| Getting ready for some intense acting! |
![]() |
Posted by Spine Chiller Productions at 02:21 0 comments
Labels: Created by Jaspreet







